Hazardous area inspections

Understand the condition of your equipment, prioritise remedial work and keep a traceable inspection record.

Typical engagement
3 days to 8 weeks
Where it applies
Zoned areas across process industry
You receive
An inspection register and a prioritised remedial list
Working to
BS EN 60079-17 · CompEx

A traceable picture of every Ex item on site

An Ex installation is only as good as the last time somebody looked at it. Gaskets perish, glands work loose, a cover goes back on with two bolts instead of six, and none of it announces itself. Inspection to BS EN 60079-17 is what turns that into something you can see and plan around.

The standard sets three grades of inspection and three types of programme. An initial inspection proves a new or modified installation. A periodic inspection keeps the picture current. Sample inspection covers part of a population to judge whether the whole population is behaving. Which mix suits your site depends on the equipment, the environment and what your last set of results looked like.

Records matter because DSEAR Regulation 6 asks you to maintain the controls you rely on, and an inspector will ask to see the evidence. A register that says only "pass" does not show maintenance; a register that names the item, the defect and what was done about it does.

Every inspection is carried out by CompEx-certified engineers. That is not a badge on a letterhead: the difference between a close and a detailed inspection is a judgement about what you are allowed to open and what you are looking at when you do.

Inspection grades

  • Visual — defects visible without tools or access equipment.
  • Close — the same, plus defects visible with access equipment and a torch.
  • Detailed — the item opened where necessary, with tools, to see inside.

What we record

For every item: the tag number, the protection concept and full Ex marking, the zone it sits in, the grade of inspection carried out, its condition, any defect with its category, and a photograph referenced against the entry. The photograph is what makes a defect arguable six months later.

How the work runs

From scope to a funded remedial plan.

  1. Scope and schedule

    Agree the population, the grades and the access windows, and align the programme to your shutdowns.

  2. Inspect and record

    Item by item, in area order, with the marking, condition and a photograph captured on the spot.

  3. Grade and prioritise

    Defects categorised as immediate, planned or monitor, and reviewed with your engineer each week.

  4. Report and plan

    A register you can maintain, a remedial programme you can fund, and the next inspection interval.