Industrial process equipment

Specialist services

Hazardous area classification

A practical assessment of your process, with clear zone drawings and the reasoning behind them.

Typical engagement
1 to 4 weeks
Where it applies
Any site handling flammable gas, vapour or dust
You receive
Zone drawings and a classification report
Working to
BS EN 60079-10-1 · 60079-10-2

Knowing where the risk is, and why

Classification is an argument, not a colouring exercise. It starts with the places a flammable substance can actually leave the process: a seal, a vent, a sample point, a hatch that is opened once a shift. Each one is graded by how often it releases and how much, and that grading is what sets the zone.

Ventilation then decides how far the zone reaches. A well-ventilated outdoor pump skid and the same pump inside a closed building are not the same problem, and the extents should show that. We work the numbers rather than defaulting to a radius somebody used on the last plant.

Gas and dust are assessed separately. Gas follows 60079-10-1 and turns on release rate and dilution; dust follows 60079-10-2 and turns on layers, housekeeping and the chance of a cloud forming. A site with both gets both, drawn so nobody has to guess which convention a zone belongs to.

What the study covers

  • Release source inventory
  • Grade and rate of release
  • Ventilation assessment
  • Zone type and extent
  • Equipment category selection
  • Drawing and register update
Illustrative hazardous area classification plan showing a vessel with Zone 1 and Zone 2 extents inside a building outline
Illustrative zone plan: a vessel with its Zone 1 extent solid and Zone 2 hatched, drawn on the building layout.

How the work runs

From process data to defensible zones.

  1. Gather

    Process flow diagrams, substance data, ventilation rates, layouts and whatever classification you already hold.

  2. Assess releases

    Walk the plant, list every release source, and grade each one by how often and how much it releases.

  3. Draw the zones

    Extents calculated from release rate and dilution, then drawn in plan and elevation on your own layouts.

  4. Review with you

    A working session with your process and engineering people before anything is issued as final.