Electrical testing and inspection

Clear findings and practical next steps for your electrical installation.

Typical engagement
1 day to 3 weeks
Where it applies
Commercial, industrial and process sites
You receive
EICR or EIC with a prioritised observations list
Working to
BS 7671

Findings you can act on

Periodic inspection and testing tells you whether an installation that has been in service is still safe to stay in service. It is a sampled exercise on most industrial sites: enough circuits, chosen well, to show whether the installation as a whole is holding up, with the sample size and the reasoning recorded on the certificate.

The value is in the observations, and observations are only useful if you can read them. C1 means danger is present and something must be done now. C2 means potentially dangerous, and remedial work is needed. C3 means improvement is recommended but nothing is unsafe today. FI means we could not see enough to decide and further investigation is required. We write each one in plain words as well as a code, so the person approving the spend understands what they are approving.

Where it helps, we add a thermographic survey of loaded switchgear. Thermal imaging finds the loose termination and the unbalanced phase that a dead test cannot, and it is done with the boards in service, which is usually the only time the fault is visible.

What we test

  • Continuity and insulation resistance
  • Polarity
  • Earth fault loop impedance
  • RCD operation
  • Functional testing
  • Thermal imaging where useful

How the work runs

From isolation plan to coded report.

  1. Plan isolations

    Agree which boards come off and when, so the testing fits your production rather than interrupting it.

  2. Test

    Dead and live testing circuit by circuit, with thermal imaging on loaded switchgear where it adds something.

  3. Code observations

    Each finding coded C1, C2, C3 or FI, located, photographed and written in plain words.

  4. Report

    An EICR with full test schedules, and a remedial estimate against the observations if you want one.