Electrical installation for sites that cannot stop
Most of our installation work happens on sites that are already running. That changes the order of everything. The design has to account for what can be isolated and when, the programme has to fit the production plan, and a containment route has to be agreed with the people who use the walkway it crosses.
We plan the work with your operations team before anyone lifts a tool. Isolations are booked, permits are raised against a method statement your site has already seen, and each phase ends in a state the plant can run in overnight. Where zoned areas are involved the installation follows BS EN 60079-14, and the equipment we select matches the zone it will sit in.
What we install
- LV distribution and switchgear
- Motor control centres and drives
- Cable containment, tray and ladder
- Ex-rated equipment in zoned areas
- Lighting, small power and earthing
- Instrumentation and control wiring
How we keep the site running
We work in phases small enough to be finished, tested and handed back inside a single window. Nothing is left part-wired at the end of a shift. Temporary supplies are labelled and logged, and every isolation is either returned or formally carried over, so your shift team always knows the state of the system they are running.