Electrical cable tray installation

Specialist services

Industrial electrical installation

Electrical systems designed around the way your site works. From a new installation to a carefully planned upgrade.

Typical engagement
2 to 12 weeks on site
Where it applies
Process plants, utilities, manufacturing
You receive
Installed, tested and certified systems
Working to
BS 7671 · BS EN 60079-14

Electrical installation for sites that cannot stop

Most of our installation work happens on sites that are already running. That changes the order of everything. The design has to account for what can be isolated and when, the programme has to fit the production plan, and a containment route has to be agreed with the people who use the walkway it crosses.

We plan the work with your operations team before anyone lifts a tool. Isolations are booked, permits are raised against a method statement your site has already seen, and each phase ends in a state the plant can run in overnight. Where zoned areas are involved the installation follows BS EN 60079-14, and the equipment we select matches the zone it will sit in.

What we install

  • LV distribution and switchgear
  • Motor control centres and drives
  • Cable containment, tray and ladder
  • Ex-rated equipment in zoned areas
  • Lighting, small power and earthing
  • Instrumentation and control wiring

How we keep the site running

We work in phases small enough to be finished, tested and handed back inside a single window. Nothing is left part-wired at the end of a shift. Temporary supplies are labelled and logged, and every isolation is either returned or formally carried over, so your shift team always knows the state of the system they are running.

How the work runs

From survey to energised system.

  1. Survey

    We walk the route with you, check what is already there and note what can be isolated, when, and by whom.

  2. Design and method

    Drawings, cable calculations and a method statement your site can review before any permit is raised.

  3. Install

    Work in phases sized to your production windows, each one finished and made safe before the shift ends.

  4. Test and hand over

    Every circuit tested and certified, drawings updated to as-installed, and a walk-through with your team.